KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  2-17-2013
Number of Hours:  2.00
Manual Reference:  Page 8-8
Brief Description:  Forward fuselage sub structure #3

The stiffeners were back riveted to the baggage floor. The nutplates were rivetd in place.

The F-866D mounting plate was riveted to the aft of the F-866A-1

I countersunk the 9 holes in the F-801D-1 flange to accomodate the #30 dimple from the F-890-1 forward floor.

Mixed up a small batch of sealant, replaced the firewall and clecoed all 9 holes.

I then riveted the firewall to the F-890-1 floor, leaving the 9 centre rivet holes clecoed.

Forward fuselage sub structure is complete for now. Still have to install a hing for the avionics access panel from the baggage compartment.
' style=

Firewall sealed and clecoed

Firewall sealed and clecoed

' style=

Baggage floor clecoed in place

Baggage floor clecoed in place

' style=

Another angle

Another angle

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.