Powered By Kitlog Pro v2.0
My RV-8 build
RV-8
Fuselage
2-17-2013
< Previous Log Entry
Next Log Entry >
Date:
2-17-2013
Number of Hours:
2.00
Manual Reference:
Page 8-8
Brief Description:
Forward fuselage sub structure #3
The stiffeners were back riveted to the baggage floor. The nutplates were rivetd in place.
The F-866D mounting plate was riveted to the aft of the F-866A-1
I countersunk the 9 holes in the F-801D-1 flange to accomodate the #30 dimple from the F-890-1 forward floor.
Mixed up a small batch of sealant, replaced the firewall and clecoed all 9 holes.
I then riveted the firewall to the F-890-1 floor, leaving the 9 centre rivet holes clecoed.
Forward fuselage sub structure is complete for now. Still have to install a hing for the avionics access panel from the baggage compartment.
Firewall sealed and clecoed
Baggage floor clecoed in place
Another angle
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
452
866
About me
1
1
Avionics
3
4
Canopy
3
6
Electrical
4
6
Empennage
74
120
Engine
6
10
Finishing Kit
2
2
Flying
3
4
Fuselage
147
353
Instruments
2
0
Miscellaneous
14
36
Panel
7
17
Practice Kits
1
1
Tools
6
16
Wings
178
287
Workshop
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.